21 Jun 2026 05:50 → 22 Jun 2026 05:50 AEST
| Capex total (greenfield) |
—
How this was derived |
|---|---|
| Capex refurbishment |
—
|
| Capex / MW |
$2,320,675
Shown in table Reported / source value |
| Fixed OPEX (annual) |
—
|
| Fixed OPEX / MW-yr default |
$55,000
Shown in table How this was derived Reference |
| Variable OPEX / MWh default |
$0.50
Shown in table |
| Fuel cost / GJ |
—
|
| Heat rate GJ/MWh |
—
|
Confidence: low · Status: ai estimated · Capex basis: default · AI checked 05 Jun 2026
Notes
No plant-specific greenfield CAPEX figure was found in owner, government, or other authoritative sources. NewEn project pages confirm the site is a planned onshore wind farm of up to 40 MW (13 x 3 MW turbines) in Victoria, with planning permit issued in June 2018. Because no reported investment amount was found, capex remains unset rather than inferred from benchmarks. O&M values were not sourced in available results, so server-side defaults were not applied here in order to keep the record source-backed only.